Installation Requirements

Before installation the client must ensure the installation area is fully prepared.

The installation surface must be level within approximately ±10mm across the pergola footprint.

Adequate access must be provided for installers and delivery of pergola components which may arrive in packages up to 7 metres long.

A suitable electrical connection must be available for electric roof systems, lighting and any accessories.

Any delays or additional work required due to incomplete preparation may result in additional charges.